Sie sind hier: Builder's Diary 4 October 13  
 BUILDER'S DIARY 4
Finished the Projekt
February 14
January 14
December 13
November 13
October 13
September 13

OKTOBER 13

19.10.2013

After the EAS checkout conducted by my building consultant and a thorough inspection of the documentation, I am now ready for the BAZL inspection.
In my opinion, the EAS and BAZL process in Switzerland takes too long before the first flight. Since the possibility of rust is caused by condensation after the test run of a previously conserved Engine, the time until first flight should not be too long.