After the EAS checkout conducted by my building consultant and a thorough inspection of the documentation, I am now ready for the BAZL inspection. In my opinion, the EAS and BAZL process in Switzerland takes too long before the first flight. Since the possibility of rust is caused by condensation after the test run of a previously conserved Engine, the time until first flight should not be too long.