|
|
|
|
|
|
JUNE 12 |
|
05.06.2012
|
I was for a long time out for work but now I've got two weeks of to work on the RV, here I finished the cowling with Mil-spec Fasteners.
|
|
|
07.06.2012
|
Most electrical and house routing finished so far.
|
|
|
09.06.2012
|
To get less heat around the cylinder-heads the louvers should help to manag this,
|
|
|
21.06.2012
|
Installed Maingear
|
|
|
|